Milestones
Cross-project milestone tracking across 18 projects.
Upcoming (30d)
9
Overdue
53
At Risk
0
Completed (MTD)
0
Requires Approval
20
Avg Delay
0d
Weighted Compl.
45%
Projects w/ Overdue
0
| Milestone | Project | Phase | Owner | Planned | Status | Progress | Days | Approval | |
|---|---|---|---|---|---|---|---|---|---|
| Project Charter Approved | Enterprise ERP Modernization | Planning | Kavita Nair | 2025-03-12 | Completed | 100% | -508d | Required | |
| Kickoff Approved | Customer Analytics Dashboard | Planning | Kavita Nair | 2025-04-06 | Completed | 100% | -483d | Required | |
| Requirements Sign-Off | Enterprise ERP Modernization | Planning | Kavita Nair | 2025-05-08 | Completed | 100% | -451d | — | |
| Kickoff Approved | Data Warehouse and Analytics Platform | Planning | Jason Lim | 2025-05-23 | Completed | 100% | -436d | Required | |
| Requirements Sign-Off | Customer Analytics Dashboard | Planning | Kavita Nair | 2025-06-10 | Completed | 100% | -418d | — | |
| Solution Blueprint Completion | Enterprise ERP Modernization | Build | Kavita Nair | 2025-07-03 | Completed | 100% | -395d | — | |
| Kickoff Approved | Digital Onboarding Platform | Planning | Kavita Nair | 2025-07-05 | Completed | 100% | -393d | Required | |
| Requirements Sign-Off | Data Warehouse and Analytics Platform | Planning | Jason Lim | 2025-08-06 | Completed | 100% | -361d | — | |
| Design Complete | Customer Analytics Dashboard | Build | Kavita Nair | 2025-08-14 | Completed | 100% | -353d | — | |
| Kickoff Approved | Cybersecurity Zero Trust Program | Planning | Jason Lim | 2025-08-22 | Completed | 100% | -345d | Required | |
| Data Migration Design | Enterprise ERP Modernization | Build | Kavita Nair | 2025-08-29 | Completed | 100% | -338d | — | |
| Kickoff Approved | Asset Maintenance Optimization | Planning | Kavita Nair | 2025-09-07 | Completed | 100% | -329d | Required | |
| Requirements Sign-Off | Digital Onboarding Platform | Planning | Kavita Nair | 2025-09-08 | Completed | 100% | -328d | — | |
| Kickoff Approved | Sustainability Reporting Initiative | Planning | Kavita Nair | 2025-09-26 | Completed | 100% | -310d | Required | |
| Build Complete | Customer Analytics Dashboard | Build | Kavita Nair | 2025-10-17 | Completed | 100% | -289d | — | |
| Kickoff Approved | Customer Mobile App Enhancement | Planning | Kavita Nair | 2025-10-18 | Completed | 100% | -288d | Required | |
| Design Complete | Data Warehouse and Analytics Platform | Build | Jason Lim | 2025-10-20 | Completed | 100% | -286d | — | |
| Integration Development | Enterprise ERP Modernization | Build | Kavita Nair | 2025-10-25 | Completed | 100% | -281d | — | |
| Requirements Sign-Off | Asset Maintenance Optimization | Planning | Kavita Nair | 2025-10-31 | Completed | 100% | -275d | — | |
| Design Complete | Digital Onboarding Platform | Build | Kavita Nair | 2025-11-12 | Completed | 100% | -263d | — | |
| Requirements Sign-Off | Cybersecurity Zero Trust Program | Planning | Jason Lim | 2025-11-13 | Completed | 100% | -262d | — | |
| Requirements Sign-Off | Sustainability Reporting Initiative | Planning | Kavita Nair | 2025-11-21 | Completed | 100% | -254d | — | |
| Kickoff Approved | API Integration Platform Rollout | Planning | Jason Lim | 2025-11-22 | Completed | 100% | -253d | Required | |
| Requirements Sign-Off | Customer Mobile App Enhancement | Planning | Kavita Nair | 2025-12-05 | Completed | 100% | -240d | — | |
| Kickoff Approved | Capability Development Academy | Planning | Kavita Nair | 2025-12-06 | Completed | 100% | -239d | Required | |
| System Integration Testing | Enterprise ERP Modernization | Test | Kavita Nair | 2025-12-20 | Completed | 100% | -225d | — | |
| Kickoff Approved | Office Expansion and Relocation | Planning | Kavita Nair | 2025-12-20 | Completed | 100% | -225d | Required | |
| UAT Sign-Off | Customer Analytics Dashboard | Build | Kavita Nair | 2025-12-21 | Completed | 100% | -224d | — | |
| Design Complete | Asset Maintenance Optimization | Build | Kavita Nair | 2025-12-24 | Completed | 100% | -221d | — | |
| Build Complete | Data Warehouse and Analytics Platform | Build | Jason Lim | 2026-01-02 | Completed | 100% | -212d | — | |
| Kickoff Approved | Regulatory Compliance Readiness | Planning | Jason Lim | 2026-01-09 | Completed | 100% | -205d | Required | |
| Requirements Sign-Off | API Integration Platform Rollout | Planning | Jason Lim | 2026-01-13 | Completed | 100% | -201d | — | |
| Build Complete | Digital Onboarding Platform | Build | Kavita Nair | 2026-01-16 | Completed | 100% | -198d | — | |
| Design Complete | Sustainability Reporting Initiative | Build | Kavita Nair | 2026-01-17 | Completed | 100% | -197d | — | |
| Design Complete | Customer Mobile App Enhancement | Build | Kavita Nair | 2026-01-21 | Completed | 100% | -193d | — | |
| Requirements Sign-Off | Capability Development Academy | Planning | Kavita Nair | 2026-01-27 | Completed | 100% | -187d | — | |
| Design Complete | Cybersecurity Zero Trust Program | Build | Jason Lim | 2026-02-03 | In Progress | 48% | -180d | — | |
| Requirements Sign-Off | Office Expansion and Relocation | Planning | Kavita Nair | 2026-02-08 | Completed | 100% | -175d | — | |
| User Acceptance Testing | Enterprise ERP Modernization | Test | Kavita Nair | 2026-02-15 | In Progress | 46% | -168d | — | |
| Build Complete | Asset Maintenance Optimization | Build | Kavita Nair | 2026-02-17 | Completed | 100% | -166d | — | |
| Requirements Sign-Off | Regulatory Compliance Readiness | Planning | Jason Lim | 2026-02-17 | Completed | 100% | -166d | — | |
| Go-Live | Customer Analytics Dashboard | Test | Kavita Nair | 2026-02-24 | Completed | 100% | -159d | — | |
| Kickoff Approved | Internal Workflow Automation | Planning | Kavita Nair | 2026-03-03 | Completed | 100% | -152d | Required | |
| Design Complete | API Integration Platform Rollout | Build | Jason Lim | 2026-03-06 | Completed | 100% | -149d | — | |
| Build Complete | Customer Mobile App Enhancement | Build | Kavita Nair | 2026-03-10 | Completed | 100% | -145d | — | |
| Build Complete | Sustainability Reporting Initiative | Build | Kavita Nair | 2026-03-14 | Completed | 100% | -141d | — | |
| Kickoff Approved | AI-Powered Finance Assistant MVP | Planning | Kavita Nair | 2026-03-16 | Completed | 100% | -139d | Required | |
| UAT Sign-Off | Data Warehouse and Analytics Platform | Build | Jason Lim | 2026-03-18 | Completed | 100% | -137d | — | |
| Design Complete | Capability Development Academy | Build | Kavita Nair | 2026-03-20 | Completed | 100% | -135d | — | |
| UAT Sign-Off | Digital Onboarding Platform | Build | Kavita Nair | 2026-03-22 | Completed | 100% | -133d | — | |
| Design Complete | Regulatory Compliance Readiness | Build | Jason Lim | 2026-03-28 | In Progress | 56% | -127d | — | |
| Design Complete | Office Expansion and Relocation | Build | Kavita Nair | 2026-03-30 | Pending | 0% | -125d | — | |
| Kickoff Approved | E-Commerce Marketplace Launch | Planning | Kavita Nair | 2026-04-06 | Completed | 100% | -118d | Required | |
| UAT Sign-Off | Asset Maintenance Optimization | Build | Kavita Nair | 2026-04-12 | In Progress | 57% | -112d | — | |
| Training Completion | Enterprise ERP Modernization | Test | Kavita Nair | 2026-04-13 | Pending | 0% | -111d | — | |
| Kickoff Approved | Vendor Consolidation Program | Planning | Jason Lim | 2026-04-13 | Completed | 100% | -111d | Required | |
| Requirements Sign-Off | Internal Workflow Automation | Planning | Kavita Nair | 2026-04-20 | Completed | 100% | -104d | — | |
| Kickoff Approved | HR Talent Management System | Planning | Jason Lim | 2026-04-22 | In Progress | 41% | -102d | Required | |
| UAT Sign-Off | Customer Mobile App Enhancement | Build | Kavita Nair | 2026-04-26 | In Progress | 45% | -98d | — | |
| Build Complete | Cybersecurity Zero Trust Program | Build | Jason Lim | 2026-04-27 | Pending | 0% | -97d | — | |
| Build Complete | API Integration Platform Rollout | Build | Jason Lim | 2026-04-27 | In Progress | 78% | -97d | — | |
| Requirements Sign-Off | AI-Powered Finance Assistant MVP | Planning | Kavita Nair | 2026-04-28 | Pending | 0% | -96d | — | |
| Project Closure | Customer Analytics Dashboard | Test | Kavita Nair | 2026-04-30 | In Progress | 73% | -94d | Required | |
| Build Complete | Regulatory Compliance Readiness | Build | Jason Lim | 2026-05-06 | Pending | 0% | -88d | — | |
| UAT Sign-Off | Sustainability Reporting Initiative | Build | Kavita Nair | 2026-05-10 | In Progress | 69% | -84d | — | |
| Build Complete | Capability Development Academy | Build | Kavita Nair | 2026-05-11 | Completed | 100% | -83d | — | |
| Build Complete | Office Expansion and Relocation | Build | Kavita Nair | 2026-05-18 | Pending | 0% | -76d | — | |
| Kickoff Approved | Cloud Migration Wave 2 | Planning | Jason Lim | 2026-05-23 | In Progress | 42% | -71d | Required | |
| Go-Live | Digital Onboarding Platform | Test | Kavita Nair | 2026-05-26 | Completed | 100% | -68d | — | |
| Requirements Sign-Off | E-Commerce Marketplace Launch | Planning | Kavita Nair | 2026-05-26 | In Progress | 70% | -68d | — | |
| Requirements Sign-Off | Vendor Consolidation Program | Planning | Jason Lim | 2026-05-27 | Pending | 0% | -67d | — | |
| Go-Live | Data Warehouse and Analytics Platform | Test | Jason Lim | 2026-06-01 | In Progress | 55% | -62d | — | |
| Go-Live | Asset Maintenance Optimization | Test | Kavita Nair | 2026-06-05 | Pending | 0% | -58d | — | |
| Design Complete | Internal Workflow Automation | Build | Kavita Nair | 2026-06-07 | In Progress | 66% | -56d | — | |
| Production Go-Live | Enterprise ERP Modernization | Deploy | Kavita Nair | 2026-06-08 | Pending | 0% | -55d | — | |
| UAT Sign-Off | Digital Onboarding Platform | UAT | Kavita Nair | 2026-06-10 | In Progress | 0% | -53d | — | |
| Design Complete | AI-Powered Finance Assistant MVP | Build | Kavita Nair | 2026-06-10 | Pending | 0% | -53d | — | |
| Executive Steering Committee | Customer Mobile App Enhancement | Development | Aisha Rahman | 2026-06-12 | Pending | 0% | -51d | — | |
| Go-Live | Customer Mobile App Enhancement | Test | Kavita Nair | 2026-06-13 | Pending | 0% | -50d | — | |
| Requirements Sign-Off | HR Talent Management System | Planning | Jason Lim | 2026-06-13 | Pending | 0% | -50d | — | |
| Compliance Audit | Regulatory Compliance Readiness | Implementation | Jason Lim | 2026-06-14 | In Progress | 0% | -49d | — | |
| UAT Sign-Off | Regulatory Compliance Readiness | Build | Jason Lim | 2026-06-14 | Pending | 0% | -49d | — | |
| Performance Test Sign-Off | Data Warehouse and Analytics Platform | Testing | Jason Lim | 2026-06-15 | Pending | 0% | -48d | — | |
| ESG Report Draft | Sustainability Reporting Initiative | Implementation | Kavita Nair | 2026-06-17 | In Progress | 0% | -46d | — | |
| UAT Completion | Enterprise ERP Modernization | Testing | Kavita Nair | 2026-06-18 | In Progress | 0% | -45d | — | |
| UAT Sign-Off | API Integration Platform Rollout | Build | Jason Lim | 2026-06-18 | Pending | 0% | -45d | — | |
| Vendor Contract Award | Office Expansion and Relocation | Procurement | Kavita Nair | 2026-06-20 | In Progress | 0% | -43d | — | |
| Production Cutover | Cybersecurity Zero Trust Program | Implementation | Jason Lim | 2026-06-22 | Pending | 0% | -41d | — | |
| Pilot Review Gate | Asset Maintenance Optimization | Pilot | Kavita Nair | 2026-06-24 | Pending | 0% | -39d | — | |
| Solution Design Sign-Off | HR Talent Management System | Planning | Jason Lim | 2026-06-25 | Pending | 0% | -38d | — | |
| Training Completion | Capability Development Academy | Implementation | Kavita Nair | 2026-06-28 | In Progress | 0% | -35d | — | |
| API Gateway Go-Live | API Integration Platform Rollout | Development | Jason Lim | 2026-06-30 | Pending | 0% | -33d | — | |
| Phase 2 Kickoff | Enterprise ERP Modernization | Implementation | Kavita Nair | 2026-07-01 | Pending | 0% | -32d | — | |
| UAT Sign-Off | Capability Development Academy | Build | Kavita Nair | 2026-07-02 | Pending | 0% | -31d | — | |
| Go-Live | Sustainability Reporting Initiative | Test | Kavita Nair | 2026-07-05 | Pending | 0% | -28d | — | |
| UAT Sign-Off | Office Expansion and Relocation | Build | Kavita Nair | 2026-07-07 | Pending | 0% | -26d | — | |
| Design Complete | Vendor Consolidation Program | Build | Jason Lim | 2026-07-09 | Pending | 0% | -24d | — | |
| Requirements Sign-Off | Cloud Migration Wave 2 | Planning | Jason Lim | 2026-07-14 | Pending | 0% | -19d | — | |
| Design Complete | E-Commerce Marketplace Launch | Build | Kavita Nair | 2026-07-15 | Pending | 0% | -18d | — | |
| UAT Sign-Off | Cybersecurity Zero Trust Program | Build | Jason Lim | 2026-07-18 | Pending | 0% | -15d | — | |
| Build Complete | AI-Powered Finance Assistant MVP | Build | Kavita Nair | 2026-07-23 | Pending | 0% | -10d | — | |
| Go-Live | Regulatory Compliance Readiness | Test | Jason Lim | 2026-07-23 | Pending | 0% | -10d | — | |
| Build Complete | Internal Workflow Automation | Build | Kavita Nair | 2026-07-24 | Pending | 0% | -9d | — | |
| Project Closure | Asset Maintenance Optimization | Test | Kavita Nair | 2026-07-30 | Pending | 0% | -3d | Required | |
| Project Closure | Customer Mobile App Enhancement | Test | Kavita Nair | 2026-07-31 | Pending | 0% | -2d | Required | |
| Project Closure | Digital Onboarding Platform | Test | Kavita Nair | 2026-07-31 | Pending | 0% | -2d | Required | |
| Hypercare Exit | Enterprise ERP Modernization | Deploy | Kavita Nair | 2026-08-04 | Pending | 0% | 2d | — | |
| Design Complete | HR Talent Management System | Build | Jason Lim | 2026-08-04 | Pending | 0% | 2d | — | |
| Go-Live | API Integration Platform Rollout | Test | Jason Lim | 2026-08-09 | Pending | 0% | 7d | — | |
| Project Closure | Data Warehouse and Analytics Platform | Test | Jason Lim | 2026-08-15 | Pending | 0% | 13d | Required | |
| Build Complete | Vendor Consolidation Program | Build | Jason Lim | 2026-08-22 | Pending | 0% | 20d | — | |
| Go-Live | Capability Development Academy | Test | Kavita Nair | 2026-08-23 | Pending | 0% | 21d | — | |
| Go-Live | Office Expansion and Relocation | Test | Kavita Nair | 2026-08-26 | Pending | 0% | 24d | — | |
| Project Closure | Sustainability Reporting Initiative | Test | Kavita Nair | 2026-08-31 | Pending | 0% | 29d | Required | |
| Project Closure | Regulatory Compliance Readiness | Test | Jason Lim | 2026-08-31 | Pending | 0% | 29d | Required | |
| Build Complete | E-Commerce Marketplace Launch | Build | Kavita Nair | 2026-09-03 | Pending | 0% | 32d | — | |
| UAT Sign-Off | AI-Powered Finance Assistant MVP | Build | Kavita Nair | 2026-09-04 | Pending | 0% | 33d | — | |
| Design Complete | Cloud Migration Wave 2 | Build | Jason Lim | 2026-09-04 | Pending | 0% | 33d | — | |
| UAT Sign-Off | Internal Workflow Automation | Build | Kavita Nair | 2026-09-10 | Pending | 0% | 39d | — | |
| Build Complete | HR Talent Management System | Build | Jason Lim | 2026-09-25 | Pending | 0% | 54d | — | |
| Project Closure | Enterprise ERP Modernization | Deploy | Kavita Nair | 2026-09-30 | Pending | 0% | 59d | Required | |
| Project Closure | API Integration Platform Rollout | Test | Jason Lim | 2026-09-30 | Pending | 0% | 59d | Required | |
| UAT Sign-Off | Vendor Consolidation Program | Build | Jason Lim | 2026-10-04 | Pending | 0% | 63d | — | |
| Go-Live | Cybersecurity Zero Trust Program | Test | Jason Lim | 2026-10-09 | Pending | 0% | 68d | — | |
| Project Closure | Office Expansion and Relocation | Test | Kavita Nair | 2026-10-15 | Pending | 0% | 74d | Required | |
| Project Closure | Capability Development Academy | Test | Kavita Nair | 2026-10-15 | Pending | 0% | 74d | Required | |
| Go-Live | AI-Powered Finance Assistant MVP | Test | Kavita Nair | 2026-10-17 | Pending | 0% | 76d | — | |
| UAT Sign-Off | E-Commerce Marketplace Launch | Build | Kavita Nair | 2026-10-23 | Pending | 0% | 82d | — | |
| Build Complete | Cloud Migration Wave 2 | Build | Jason Lim | 2026-10-26 | Pending | 0% | 85d | — | |
| Go-Live | Internal Workflow Automation | Test | Kavita Nair | 2026-10-28 | Pending | 0% | 87d | — | |
| UAT Sign-Off | HR Talent Management System | Build | Jason Lim | 2026-11-16 | Pending | 0% | 106d | — | |
| Go-Live | Vendor Consolidation Program | Test | Jason Lim | 2026-11-17 | Pending | 0% | 107d | — | |
| Project Closure | AI-Powered Finance Assistant MVP | Test | Kavita Nair | 2026-11-30 | Pending | 0% | 120d | Required | |
| Go-Live | E-Commerce Marketplace Launch | Test | Kavita Nair | 2026-12-12 | Pending | 0% | 132d | — | |
| Project Closure | Internal Workflow Automation | Test | Kavita Nair | 2026-12-15 | Pending | 0% | 135d | Required | |
| UAT Sign-Off | Cloud Migration Wave 2 | Build | Jason Lim | 2026-12-17 | Pending | 0% | 137d | — | |
| Project Closure | Cybersecurity Zero Trust Program | Test | Jason Lim | 2026-12-31 | Pending | 0% | 151d | Required | |
| Project Closure | Vendor Consolidation Program | Test | Jason Lim | 2026-12-31 | Pending | 0% | 151d | Required | |
| Go-Live | HR Talent Management System | Test | Jason Lim | 2027-01-07 | Pending | 0% | 158d | — | |
| Project Closure | E-Commerce Marketplace Launch | Test | Kavita Nair | 2027-01-31 | Pending | 0% | 182d | Required | |
| Go-Live | Cloud Migration Wave 2 | Test | Jason Lim | 2027-02-07 | Pending | 0% | 189d | — | |
| Project Closure | HR Talent Management System | Test | Jason Lim | 2027-02-28 | Pending | 0% | 210d | Required | |
| Project Closure | Cloud Migration Wave 2 | Test | Jason Lim | 2027-03-31 | Pending | 0% | 241d | Required |